top of page
House Tour

FEATURED PROJECTS

FOLLOW OUR SOCIALS FOR REGULAR UPDATES 

  • Instagram
  • LinkedIn

SOUTH SHIELDS 
6 BED HMO CONVERSION

3-bedroom property converted into a 6-bedroom, 6-ensuite HMO through full internal reconfiguration and refurbishment, with over £110,000 spent on the refurb project.

 

• Full layout redesign to maximise room count

• Installation of 6 ensuite bathrooms

• New plumbing, heating and electrics throughout

• Fire safety upgrades and HMO compliance works

• Building control approvals obtained

 

Completed in approximately 15 weeks and delivered as a fully compliant, high-yielding HMO ready for letting.

214 Dean Road-100.jpg

BEFORE & AFTER

STOCKTON
BRR - BLOCK OF 4 FLATS

Block of 4 flats fully refurbished and reconfigured for remote investors to improve layout, increase rental potential and bring the building up to a compliant standard. Refurbishment cost circa £130,000.

 

• Reconfiguration works including converting 3 one-bed flats into 2-bedroom units

• Kitchen relocation to optimise layout and usability

• New dropped ceilings installed within 2 flats

• New roof section 

• All new SWA electrical feeds installed from meter cupboard

• Full fire safety upgrades including Grade D1 LD1 system and fire doors

• Full internal refurbishment throughout all units

 

Completed in approximately 14 weeks and repositioned as a fully compliant, income-generating block.

IMG_4430.JPG

BEFORE & AFTER

STOCKTON
BRR - BUY TO LET

Investor project with a 3-bedroom property taken from poor condition to a modern rental standard. Refurbishment cost circa £23,000.

 

• External wall tie replacement works completed

• New modern kitchen installed

• Bathroom fully refurbished with tiled black accent finish

• Partial replastering, new flooring and full redecoration

 

Completed in approximately 6 weeks and let shortly after completion as a compliant, long-term rental.

IMG_6655.JPG

BEFORE & AFTER

BILLINGHAM 
BRR - SERVICED ACCOMODATION

3-bedroom end-terraced property taken from a poor condition and fully refurbished into a serviced accommodation unit. Refurbishment cost circa £33,000.

 

• Full strip out and refurbishment throughout including damp proof

• New kitchen and bathroom installation

• New flooring, plastering and full redecoration

• New Driveway, fence and rear landscaping

 

Completed in approximately 8 weeks from start to finish.

f743cb68-4c4c-4dba-9b51-cb73078ef67a.jpg

BEFORE & AFTER

STOCKTON
SEMI DETACHED - FLIP

3-bedroom property taken from very poor condition and fully refurbished to a modern standard, including major upgrades to heating, layout and external space.

 

• Air duct heating system replaced with combi boiler & full re-pipe

• New kitchen and fully refurbished bathroom

• Full skim throughout with new flooring and decoration

• Upgraded electrics

• Replacement French doors and improved rear access

• Full rear external upgrade including patio and all new turf

 

Completed in approximately 9 weeks and brought back to market as a modern, high-spec family home.

89956496-b5d9-4f89-80c4-fa727825349e.jpg

BEFORE & AFTER

  • Whatsapp
bottom of page