FEATURED PROJECTS
SOUTH SHIELDS
6 BED HMO CONVERSION
3-bedroom property converted into a 6-bedroom, 6-ensuite HMO through full internal reconfiguration and refurbishment, with over £110,000 spent on the refurb project.
• Full layout redesign to maximise room count
• Installation of 6 ensuite bathrooms
• New plumbing, heating and electrics throughout
• Fire safety upgrades and HMO compliance works
• Building control approvals obtained
Completed in approximately 15 weeks and delivered as a fully compliant, high-yielding HMO ready for letting.

BEFORE & AFTER
STOCKTON
BRR - BLOCK OF 4 FLATS
Block of 4 flats fully refurbished and reconfigured for remote investors to improve layout, increase rental potential and bring the building up to a compliant standard. Refurbishment cost circa £130,000.
• Reconfiguration works including converting 3 one-bed flats into 2-bedroom units
• Kitchen relocation to optimise layout and usability
• New dropped ceilings installed within 2 flats
• New roof section
• All new SWA electrical feeds installed from meter cupboard
• Full fire safety upgrades including Grade D1 LD1 system and fire doors
• Full internal refurbishment throughout all units
Completed in approximately 14 weeks and repositioned as a fully compliant, income-generating block.

BEFORE & AFTER
STOCKTON
BRR - BUY TO LET
Investor project with a 3-bedroom property taken from poor condition to a modern rental standard. Refurbishment cost circa £23,000.
• External wall tie replacement works completed
• New modern kitchen installed
• Bathroom fully refurbished with tiled black accent finish
• Partial replastering, new flooring and full redecoration
Completed in approximately 6 weeks and let shortly after completion as a compliant, long-term rental.

BEFORE & AFTER
BILLINGHAM
BRR - SERVICED ACCOMODATION
3-bedroom end-terraced property taken from a poor condition and fully refurbished into a serviced accommodation unit. Refurbishment cost circa £33,000.
• Full strip out and refurbishment throughout including damp proof
• New kitchen and bathroom installation
• New flooring, plastering and full redecoration
• New Driveway, fence and rear landscaping
Completed in approximately 8 weeks from start to finish.

BEFORE & AFTER
STOCKTON
SEMI DETACHED - FLIP
3-bedroom property taken from very poor condition and fully refurbished to a modern standard, including major upgrades to heating, layout and external space.
• Air duct heating system replaced with combi boiler & full re-pipe
• New kitchen and fully refurbished bathroom
• Full skim throughout with new flooring and decoration
• Upgraded electrics
• Replacement French doors and improved rear access
• Full rear external upgrade including patio and all new turf
Completed in approximately 9 weeks and brought back to market as a modern, high-spec family home.